[tsc] Draft 0.1 of the technical Strategy Document.

Geoffrey Fox gcf at grids.ucs.indiana.edu
Wed Aug 23 18:08:03 CDT 2006


Here is an edit including comments we got
I apologize if I messed up!
Maybe we should let Mark have the pen as he
interacts with the board

Chris Kantarjiev wrote:
> Application Provisioning
>
> Job submission, and indeed any sort of workload manager, implies the ability to 
> discover, describe, provision and manage the lifetime of an appropriate 
> application code onto an identified computing resource. In many instances, this 
> can be done at a very high level, but some scenarios will require very specific 
> descriptions at the application layer. This, in turn, may place requirements for 
> a specific operating system and version, possibly implying a certain patch level 
> and hardware requirements.
>
> EGA's Reference Model describes the overall flow of activity involved in 
> provisioning a high-level component and decomposing the required work into 
> accessible quanta: ACS and CDDLM are specific proposals/WGs that attack the 
> problems of describing and managing the lifetime of specific applications.
> _______________________________________________
> tsc mailing list
> tsc at ogf.org
> http://www.ogf.org/mailman/listinfo/tsc
>
>   

-- 
:
: Geoffrey Fox  gcf at indiana.edu FAX 8128567972 http://www.infomall.org
: Phones Cell 812-219-4643 Home 8123239196 Lab 8128567977
: SkypeIn 812-669-0772 with voicemail, International cell 8123910207

-------------- next part --------------
A non-text attachment was scrubbed...
Name: draft-ogf-tsc-strategy-0.1gcf.doc
Type: application/msword
Size: 156672 bytes
Desc: not available
Url : http://www.ogf.org/pipermail/tsc/attachments/20060823/38dfcd15/attachment-0001.doc 


More information about the tsc mailing list