Hi, here is another glitch: the Job.checkpoint method has as Pre and Post conditions that the Job is in Running state. However, the Notes say that an IncorrectState exception is thrown when the job is not in Running or Suspended state. Can you checkpoint a job in suspended state? Ceriel