[ogsa-wg] Agenda for Monday, August 14th (5pm to 7pm (CDT))
Andreas Savva
andreas.savva at jp.fujitsu.com
Sun Aug 13 23:09:55 CDT 2006
The following is the proposed agenda for the OGSA-WG teleconference on
Aug. 14th Monday from 5pm to 7pm (CDT).
The dial-in number for Monday;
US: +1 718 3541071 (New York) or
+1 408 9616509 (San Jose)
UK: +44 (0)207 3655269 (London)
Japan: +81 (0)3 3570 8225 (Tokyo)
Complete dial-in information: http://tinyurl.com/eg48j
PIN: 4371991
Screen share service will be provided.
URL: http://ogsa.glance.net
Session key: 0814
See more explanation:
http://www-unix.gridforum.org/mail_archive/ogsa-wg/2004/06/msg00077.html
1) Early discussion (10 min)
Note taker assignment
Roll call
Telecon minutes approval (Aug. 10th), if available
Action Items status review (see bottom of this email)
Agenda bashing
2) OGSA Roadmap (Chris, 40 min)
> A slightly edited version of the OGSA Roadmap v1.1 has been uploaded
> to GridForge, at:
>
> https://forge.gridforum.org/sf/go/doc13733?nav=1
>
> At this point, all I've done is added a comment or two and done some
> rewriting of the introductory section. Please feel free to download
> and read it if you'd like to discuss or savage my changes on
> tomorrows call.
5) Wrap up (10 min)
AOB
<*NEXT CALL*>
Aug. 17 (Thu): Info/data model (Ellen and Fred),
EMS and data joint scenarios (Allen and Steven)
Aug. 21 (Mon):
Aug. 24 (Thu): CDDLM joint (Jun, Dejan, and Hiro)
Aug. 28 (Mon): Security (Takuya and Frank)
Aug. 31 (Thu): EMS scenarios (Andreas and Steven)
Sept. 4 (Mon): No call (Labor Day)
Sept. 7 (Thu): Roadmap (Chris), GGF18 prep (Tom and Hiro)
Telecon schedule:
https://forge.gridforum.org/projects/ogsa-wg/document/telecon_schedule/
<*ACTION ITEMS*>
[Not sure if there were updates on the Aug.10th call.]
> > From Aug. 3 call
AI-0803a: Hiro to look into an option for a second EMS/Data call
on Sep 7. Tentative; needs confirmation with likely
participants.
AI-0803c: Ellen to book the IBM facility on Thursday afternoon
AI-0803d: Hiro to divide GGF18 B2B F2F survey into three periods:
Thursday afternoon, Friday morning and afternoon.
AI-0803e: Jun will provide an example of the CDL mechanism and why
using ID/IDREF is not a good idea.
AI-0803f: Jun will update the CDL document to remove the Environment
variables
> > From July 20 F2F
- Andreas and Hiro to revise the EMS scenario document (i.e. examples)
so that proposal 2 is fulfilled
+ Andreas will merge Hiro's updates into the next draft
- EGR-WG (Ravi) will contact Geoffrey Fox and invites him to
contribute use cases.
- Andreas to go through the minutes and formulate a reply mail to
Geoffrey on each artifact covered in these minutes.
<postponed>
- Steve McGough & Andreas to do a mapping from the current JSDL
elements / terminology into the new information model structure
(Proposed split into Description and Requirements)
(from July 18th F2F, postpone until Aug. 17)
--
Andreas Savva
Fujitsu Laboratories Ltd
-------------- next part --------------
A non-text attachment was scrubbed...
Name: OGSA Teleconference.ics
Type: text/calendar
Size: 3837 bytes
Desc: not available
Url : http://www.ogf.org/pipermail/ogsa-wg/attachments/20060814/19f639de/attachment.ics
More information about the ogsa-wg
mailing list