[ogsa-wg] Proposed agenda for Nov. 7th call

Andreas Savva andreas.savva at jp.fujitsu.com
Mon Nov 7 02:22:11 CST 2005


I've uploaded a new draft (003) adding text for the 'jsdl to do'
mentioned in section 2.3. This was discussed on the last call.

URL:
https://forge.gridforum.org/projects/ogsa-wg/document/proposed-ems-roadmap/3

Andreas

Hiro Kishimoto wrote:
> Hi all,
> 
>> EMS team is working on "composition roadmap"
>>
> https://forge.gridforum.org/projects/ogsa-wg/document/proposed-ems-roadmap/
> 
> I've incorporate reviewed sequence diagrams, Steven's text, Ian's
> comments, and Dejan's summary into the document.
> 
> Steven: Please keep adding more contents to this draft.
> 
> Thanks,
> ----
> Hiro Kishimoto
> 
> Hiro Kishimoto wrote:
> 
>> Hi all,
>>
>> The following is a proposed agenda for OGSA-WG telecon on Nov. 7th
>> Monday from 4pm to 6pm (CST).
>>
>> *ATTENTION* From Oct. 31 and onward telecon starts one hour earlier
>>             5pm EST = 4pm CST = 2pm PST = 10pm UK = 7am JST
>>
>> The dial-in number for Monday;
>>   Free: +1-866-639-4741
>>   Toll: +1-574-935-6703
>>   PIN:  8980700
>>
>> Screen share service will be provided.
>>   URL:         http://ogsa.glance.net
>>   Session key: 1107
>> See more explanation:
>> http://www-unix.gridforum.org/mail_archive/ogsa-wg/2004/06/msg00077.html
>>
>> 1) Early discussion (10 min)
>>         Note taker assignment
>>         Roll call
>>         Telecon minutes approval (Nov. 2nd)
>> https://forge.gridforum.org/projects/ogsa-wg/document/minutes-20051102/en/1
>>
>>         Agenda bashing
>>
>> 2) CDDLM/ACS/GRAAP joint call preparation (10 min)
>>         This Wednesday is a joint call with CDDLM/ACS/GRAAP in order to
>>         review progress after GGF15. EMS team needs to get ready for it.
>>
>>  > From F2F minutes;
>>
>>>    - Action: Agreed on two-pronged approach for CDDLM(+ACS) on one
>>>              side and EMS on the other to describe their approaches in
>>>              more detail and to then unify those approaches. (Note
>>>              these are 3 separate actions.)
>>
>>
>>
>>>    - Action(1): CDDLM team volunteered to look into two issues that were
>>>              identified as requirements and report back in an OGSA call
>>>              1. Where to draw the line in the (CDL) provisioning tree
>>>                 (see above)
>>>              2. How to provide the cost of configuration 
>>
>>
>>
>> Dejan already sent out their discussion summary to the list;
>> http://www-unix.gridforum.org/mail_archive/ogsa-wg/2005/10/msg00026.html
>>
>>>   Actions(2):
>>>   - RSS-WG to produce abstract interface (and responsibilities) of EPS
>>>     and CSG.
>>>   - Clarify responsibilites/functionality of JM
>>>   - Andreas to send detailed EMS draft (pre OGSA 1.0) document to
>>>     Steven N.
>>
>>
>>
>> EMS team is working on "composition roadmap"
>> https://forge.gridforum.org/projects/ogsa-wg/document/proposed-ems-roadmap/
>>
>>
>>>    Action(3): Set up a team to explore WS_Agreements issues more,
>>>            especially relating to allocation and QoS assurance.  And
>>>            come back to OGSA-WG on how to use WS-Agreement (possibly
>>>            evolved) with EMS. Clarify
>>>            - How WS-Agreement possibly needs to change to fit in OGSA
>>>              EMS
>>>            - Set the first review after 30 days; check what can be
>>>              done.
>>>            - Volunteers: Steven Newhouse (to lead), Dave Berry, Chris
>>>              Smith, (Jim Pruyne; not present >GRAAP-WG to confirm)
>>
>>
>>
>> 3) Common UML tool (20 min)
>>
>>  >    - Mike Behrens has some experience with a number of the listed
>>  >      tools. He volunteered to check out the rest and give an
>>  >      evaluation next week
>>  >      - export/import as one required feature
>>  >
>>  >    - One of the IBM participants will follow up and confirm the
>>  >      procedures needed and that everyone can use the RSM tool, if the
>>  >      group decides to go with it.
>>
>> 4) Basic Security Profile document review (60 min)
>>      Takuya will post revised draft before the call.
>>
>> 5) Glossary 1.5 discussion (20 min)
>>      Jem will lead several open issues in Glossary 1.5.
>>
>> 6) Wrap up (10 min)
>>         AOB
>>
>> <NEXT CALL>
>> Nov. 9  (Wed) EMS architecture, CDDLM/ACS/GRAAP joint call
>>               information model & CIM profile
>> Nov. 14 (Mon) OGSA-AuthZ joint call
>>               Basic Security Profile document final review,
>>               Architecture & Glossary 1.5
>> Nov. 16 (Wed) EMS architecture,
>>               information model & CIM profile
>>
>> Telecon schedule:
>> https://forge.gridforum.org/projects/ogsa-wg/document/telecon_schedule/
>>

-- 
Andreas Savva
Fujitsu Laboratories Ltd





More information about the ogsa-wg mailing list