[ogsa-wg] Proposed agenda for Nov. 7th call

Hiro Kishimoto hiro.kishimoto at jp.fujitsu.com
Mon Nov 7 00:07:13 CST 2005


Hi all,

 > EMS team is working on "composition roadmap"
 > 
https://forge.gridforum.org/projects/ogsa-wg/document/proposed-ems-roadmap/

I've incorporate reviewed sequence diagrams, Steven's text, Ian's
comments, and Dejan's summary into the document.

Steven: Please keep adding more contents to this draft.

Thanks,
----
Hiro Kishimoto

Hiro Kishimoto wrote:
> Hi all,
> 
> The following is a proposed agenda for OGSA-WG telecon on Nov. 7th
> Monday from 4pm to 6pm (CST).
> 
> *ATTENTION* From Oct. 31 and onward telecon starts one hour earlier
>             5pm EST = 4pm CST = 2pm PST = 10pm UK = 7am JST
> 
> The dial-in number for Monday;
>   Free: +1-866-639-4741
>   Toll: +1-574-935-6703
>   PIN:  8980700
> 
> Screen share service will be provided.
>   URL:         http://ogsa.glance.net
>   Session key: 1107
> See more explanation:
> http://www-unix.gridforum.org/mail_archive/ogsa-wg/2004/06/msg00077.html
> 
> 1) Early discussion (10 min)
>         Note taker assignment
>         Roll call
>         Telecon minutes approval (Nov. 2nd)
> https://forge.gridforum.org/projects/ogsa-wg/document/minutes-20051102/en/1
>         Agenda bashing
> 
> 2) CDDLM/ACS/GRAAP joint call preparation (10 min)
>         This Wednesday is a joint call with CDDLM/ACS/GRAAP in order to
>         review progress after GGF15. EMS team needs to get ready for it.
> 
>  > From F2F minutes;
> 
>>    - Action: Agreed on two-pronged approach for CDDLM(+ACS) on one
>>              side and EMS on the other to describe their approaches in
>>              more detail and to then unify those approaches. (Note
>>              these are 3 separate actions.)
> 
> 
>>    - Action(1): CDDLM team volunteered to look into two issues that were
>>              identified as requirements and report back in an OGSA call
>>              1. Where to draw the line in the (CDL) provisioning tree
>>                 (see above)
>>              2. How to provide the cost of configuration 
> 
> 
> Dejan already sent out their discussion summary to the list;
> http://www-unix.gridforum.org/mail_archive/ogsa-wg/2005/10/msg00026.html
> 
>>   Actions(2):
>>   - RSS-WG to produce abstract interface (and responsibilities) of EPS
>>     and CSG.
>>   - Clarify responsibilites/functionality of JM
>>   - Andreas to send detailed EMS draft (pre OGSA 1.0) document to
>>     Steven N.
> 
> 
> EMS team is working on "composition roadmap"
> https://forge.gridforum.org/projects/ogsa-wg/document/proposed-ems-roadmap/
> 
>>    Action(3): Set up a team to explore WS_Agreements issues more,
>>            especially relating to allocation and QoS assurance.  And
>>            come back to OGSA-WG on how to use WS-Agreement (possibly
>>            evolved) with EMS. Clarify
>>            - How WS-Agreement possibly needs to change to fit in OGSA
>>              EMS
>>            - Set the first review after 30 days; check what can be
>>              done.
>>            - Volunteers: Steven Newhouse (to lead), Dave Berry, Chris
>>              Smith, (Jim Pruyne; not present >GRAAP-WG to confirm)
> 
> 
> 3) Common UML tool (20 min)
> 
>  >    - Mike Behrens has some experience with a number of the listed
>  >      tools. He volunteered to check out the rest and give an
>  >      evaluation next week
>  >      - export/import as one required feature
>  >
>  >    - One of the IBM participants will follow up and confirm the
>  >      procedures needed and that everyone can use the RSM tool, if the
>  >      group decides to go with it.
> 
> 4) Basic Security Profile document review (60 min)
>      Takuya will post revised draft before the call.
> 
> 5) Glossary 1.5 discussion (20 min)
>      Jem will lead several open issues in Glossary 1.5.
> 
> 6) Wrap up (10 min)
>         AOB
> 
> <NEXT CALL>
> Nov. 9  (Wed) EMS architecture, CDDLM/ACS/GRAAP joint call
>               information model & CIM profile
> Nov. 14 (Mon) OGSA-AuthZ joint call
>               Basic Security Profile document final review,
>               Architecture & Glossary 1.5
> Nov. 16 (Wed) EMS architecture,
>               information model & CIM profile
> 
> Telecon schedule:
> https://forge.gridforum.org/projects/ogsa-wg/document/telecon_schedule/
> 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: proposed-ems-roadmap-002.doc
Type: application/msword
Size: 253952 bytes
Desc: not available
Url : http://www.ogf.org/pipermail/ogsa-wg/attachments/20051107/c5d7377b/attachment.doc 


More information about the ogsa-wg mailing list