[ogsa-hpcp-wg] Platform Terminate Semantics
Peter G. Lane
lane at mcs.anl.gov
Thu Nov 9 12:34:18 CST 2006
When I try to destroy a Finished job through the Platform endpoint, it always returns the following
error:
java.lang.Exception: Unable to destroy job:
Activity identified by EPR has finished already
Is this because the service doesn't have any per-job state? Are these semantics acceptable. The BES
spec doesn't really say anything about the semantics of calling this operation after the job status
is Finished. I treats it more like a cancel operation. The description of the Finished state also
doesn't say anything about what this means with respect to a job's state.
Anyway, I'm not trying to pick on Platform for doing it this way, but I think it's an interesting
question that should be addressed at some point.
Peter
-------------- next part --------------
A non-text attachment was scrubbed...
Name: smime.p7s
Type: application/x-pkcs7-signature
Size: 3804 bytes
Desc: S/MIME Cryptographic Signature
Url : http://www.ogf.org/pipermail/ogsa-hpcp-wg/attachments/20061109/668cd1f7/attachment.bin
More information about the ogsa-hpcp-wg
mailing list